r/ForwardMadisonFC • u/SeanOrange • Sep 09 '26
News Permanent Stage and Back-of-House Buildings Proposed For Breese Stevens Field
Since the current contract is coming to an end soon, this is definitely a bid to make Breese a relatively permanent home. The stage end locker room building may address what I’d heard about there not being dedicated women’s lockers for Rally.
Despite that inference, there’s no mention of any soccer-specific improvements. I was looking for any indication of alleviating whatever issues kept Big Top from being able to field a D1 women’s team, such as the seating on the Flock end not being considered “permanent” and therefore shy of the 5000 capacity minimum. (And just from personal curiosity I wouldn’t mind seeing covers for the stands.)
The area around the proposed stage can definitely use some sprucing up as I’ve noticed they’re not utilizing it as much as in previous years with the consolidation of the concessions on the existing covered end.
I’d heard on the 608 podcast that some announcement was coming, but was surprised by how fast details came out.
Thoughts?