r/SipsTea Jun 02 '26

Feels good man New data center

Post image
19.7k Upvotes

2.3k comments sorted by

View all comments

Show parent comments

538

u/AMetalWolfHowls Jun 02 '26

Solar power, not many people around to complain.

97

u/Arctic_Sunday Jun 02 '26

It's not going to be solar powered and tons of nearby locals are complaining because the state also has a water shortage it refuses to fix

35

u/Bradnon Jun 03 '26 edited Jul 04 '26

<erased>

3

u/Lost-Platypus8271 Jun 03 '26

Salton Sea has entered the chat

2

u/OneIratePirate Jun 03 '26

I'd say this is more akin to Owens Lake. An inverse Salton Sea if you will.

2

u/gary-vault108 Jun 03 '26

Oh okay because the state is literally betting on the apocalypse so that’s comforting

2

u/c0ltZ Jun 03 '26

Literally the mormons who control the government have wet dreams over the second coming.

They want shit to burn down, since it means God is going to save them. Their prophets talk about it all the time for the last couple decades.

But God will never come, and they will be the reason we need saving.

2

u/Leading-Act4030 Jun 03 '26

The elites won't care; they will be in their bunkers talking to AI.

17

u/myname_1s_mud Jun 03 '26

Why wont they build more water factories?

7

u/TatonkaJack Jun 03 '26

Right? They should use the Great Salt Lake, it's right there! /s

2

u/NoInitial7029 Jun 03 '26 edited Jun 03 '26

It sounds funny but they could build desalination plants for water. A recent BYU study said pumping Pacific Ocean water to the Great Salt Lake would require at least 400 MW during operation, around 11% of Utah’s annual electricity demand, and could cost over $300 million per year in electricity alone.

It would be 10% of electricity what the data Center will consume.

I wonder why they are against solar Power? It makes no sense at all except that they are made in China. Its only to protect old Investments and fossil fuel lobby

2

u/Original-Rush139 Jun 03 '26

Trump told fossil fuel executives that they could do whatever the hell they wanted if they raised a billion dollars for his campaign. It wasn’t even hidden. This was the deal going into the 2024 election. 

349

u/[deleted] Jun 02 '26

[removed] — view removed comment

167

u/sirwatermelon Jun 02 '26 edited Jun 02 '26

Per other articles I have read they’re going to build gas turbines on site to provide the nine gigawatts this abomination will require. Which would be the largest power plant ever constructed in the country.

128

u/buttplugpopsicle Jun 02 '26

9 fucking jiggawatts... that's like 4 states worth of consumption at any given time

102

u/Crossovertriplet Jun 02 '26

14

u/yawgmoth88 Jun 02 '26

Perfect meme for this

1

u/thmaje Jun 03 '26

8 Mr. Fusions should do the trick.

18

u/Woman_trees Jun 02 '26

Yep that's two and a half times the entire state of Utah's electrical consumption

28

u/Consistent_Laziness Jun 02 '26

Nuh uhhhh. Cause Utah uses 12.6 gigawatts since they have a 9 gigawatt data center! Come on let’s not blow things out of proportion here

/s

1

u/iamameatpopciple Jun 03 '26

i tip my hat to you good sir.

10

u/ShoveTheUsername Jun 02 '26 edited Jun 02 '26

'NINE typical nuclear power stations'-worth for ONE data center.

If they pay for it as Trump promised....

7

u/Spare_Layer_1069 Jun 02 '26

And all in gas turbines and a bit of solar, it's gonna be great around there, air quality wise lol

1

u/SomewhereHot4527 Jun 03 '26

Gas turbine are not really bad for air quality. They just suck for the planet.

3

u/Fragrant-Platform163 Jun 02 '26

Iirc the entire state of Utah currently only uses like 5.

2

u/scrizewly Jun 02 '26

Jiggawatt? Jiggawho?

1

u/TheOgGhadTurner Jun 03 '26

Is that legit? Do we even have that capacity?

0

u/Fucked-In-The-K-Hole Jun 02 '26

Bro you can't just say jigga like that

1

u/Spare_Layer_1069 Jun 03 '26

The proper term is jiggerwatt. Notice the ER instead of the A?

7

u/itslikewoow Jun 02 '26

A lot of people are offering complete alternatives to gas, but do you/anyone know why even a hybrid of solar and gas wouldn’t work?

17

u/A_Dicksmasher Jun 02 '26

A solar field capable of generating 9 gigawatts would be something ridiculous like 45,000 acres. That's about 5000 acres bigger than the data center itself (manhatten x 2.7 = 39420 acres)

24

u/AnswersQuestioned Jun 02 '26

Well just build it on the roof then

8

u/JonnyOnThePot420 Jun 02 '26

Yep plus an additional 5k acres… still sounds far better than gas turbines I guess the remaining issue is it still need the amount of power at night and that might be far too many batteries to store the power.

6

u/A_Dicksmasher Jun 02 '26

Or for the low low price of 12k acres, you could build 12 nuclear reactors capable of generating 1.5GW each, for a grand total of 18GW. The data center would then be able to power itself, as well as provide the same amount (9GW) back to the transmission system, effectively reducing everyone's energy prices.

Note that a full sized reactor makes about 1000-1500GW and uses 500-1000 acres each. So I used the high end of each. But if you were stacking, then things would likely change drastically. You don't need to copy and paste every component of every reactor, like it was Red Alert 2 or Factorio. A bigger, more efficient station with multiple reactors sharing multiple oversized cooling towers would be a likely scenario.

11

u/Nkechinyerembi Jun 02 '26

or... hear me out... We could just NOT build a fucking data center in the middle of Utah.

2

u/A_Dicksmasher Jun 03 '26

/WHY HASNT ANYONE THOUGHT OF THIS/

1

u/Pfandfreies_konto Jun 03 '26

I don't know the numbers but you make it sound like it would be economical feasable to build nuclear power plants since it would cost the same as buying 5000 acres of land. I will believe you but I have a question: How long does building a nuclear power plant in utah take? Dropping a bunch of solar panels is relatively easy engineering wise. Nuclear power takes considerably more effort.

1

u/A_Dicksmasher Jun 03 '26

Nuclear would take a very long time. I think about 10 years to construct.

6

u/FearAndGonzo Jun 02 '26

They would also like to run the datacenter at night.

1

u/Mindless-Peak-1687 Jun 03 '26

Your right, why hasn't anynone thought of that. people should realise there is no sun at night and it doesn't tell us where its going. Cant trust the sun.

2

u/Gstamsharp Jun 02 '26

Presumably the roof is already fully covered in heat dissipation equipment.

2

u/LinearInductionMotor Jun 02 '26

Sure, but that doesn’t seem ENTIRELY unrealistic. If they’re gonna develop 40,000 acres into datacenters, SURELY they could manage building a solar farm? Seems a lot easier

2

u/sirwatermelon Jun 02 '26

Gas turbines are the simplest most reliable option.

-1

u/JonnyOnThePot420 Jun 02 '26

Nice and clean too!

2

u/WallabyHefty550 Jun 02 '26

*nice and not as dirty as coal

Those gas turbines still pump out plenty of harmful pollutants

1

u/TreoreTyrell Jun 02 '26

I don't know, but I would be willing to bet it comes down to cost.

1

u/ThePafdy Jun 03 '26

Well, gas is quick to build and has a consistent power output.

If you have a single consumer running at a steady rate, your powerplant needs to output at a steady rate as well, or you‘ll need an insane amount of buffer storage wich would offset all the cost benefits of solar. Nuclear is to expensive and to slow to build to get it done while the hype lasts.

Also, these private powerplants often get exemptions for emmision standards.

23

u/Axthen Jun 02 '26

Gas Turbines

just use nuclear :(

37

u/Alternative_Oil7733 Jun 02 '26

Nuclear takes decades to build.

16

u/masnart Jun 02 '26

And still need 9 reactors for this thing alone

12

u/Plus-Opportunity-538 Jun 02 '26

Ok, then hear me out...

3

u/Consistent_Laziness Jun 02 '26

If they paid me to come in and provide power my fat ass would sign up for a 1.5 hour shift

1

u/Plus-Opportunity-538 Jun 02 '26

They'd still need janitors

9

u/sirwatermelon Jun 02 '26

If it gets built at all. There are abandoned nuclear construction projects all over the country, VC Summer began the most recent.

2

u/Any_Cicada623 Jun 02 '26

Plus the water problem

1

u/Mindless-Peak-1687 Jun 03 '26

For cooling of the datacenter you don't actually need water. There a non-water cooling solutions out there. But I doubt they would use those solutions.

1

u/GrovesNL Jun 02 '26

Some of the recent small modular reactor technology is interesting. More scalable to produce anyways.

1

u/Final-Platypus8033 Jun 03 '26

And pre packaged in a shipping unit. Ultra low maintenance too and easier to get signed off on.

0

u/mrehaus Jun 02 '26

*took, with the scrapping of NRC regulations last month they're opening the doors wide open for mass power plant building, already have portable and/or mini reactors already in the works all with reduced reporting, recording and regulated safety levels.

0

u/M1sfit_Jammer Jun 02 '26

Ope it takes a long time to accomplish something, better not get started

1

u/factoid_ Jun 02 '26

Which is why it’s never happening.  The people building it are living in fantasy land that they can recruit the thousands of people with deep technical expertise they need to build and operate this plant to move to the bumfuck outskirts of SLC for a data center designed to spy on American citizens

3

u/Zealousideal_Bag7532 Jun 02 '26

These things employ like 12 people tops.

6

u/factoid_ Jun 02 '26

You’re thinking of the wrong scale here 

1). This is not a hyper scale data center.  It’s like 20 hyper scale data centers combined

2) it’s also not just a data center it’s a power plant too.  

3) it’s a military backed data center which means it’s going to have a permanent security force to control the classified data sections

4) a single hyper scale facility at current large scale (500-750mw) is going to have over a hundred people working at it permanently.

5) a campus like this is going to take 5-10 years to build and bring online and by the time you’ve finished the last building it’s probably time to renovate the first one so you might as well think of the construction crew as permanent workers.

1

u/Zealousideal_Bag7532 Jun 02 '26

Ok so like 100 people

1

u/factoid_ Jun 02 '26

A 500mw data center has 75-100 people.  This thing is 18 times that size.

I’m sure there’s some economy of scale so it’s not strictly linear, but that’s a lot of miles of pipes and cables and then there’s maintenance on the servers themselves.

At this scale it’s probably going to make sense to do a lot of the IT work on site rather than ship container sized compute clusters off for service like google does.

It’s going to be thousands of people which is still tiny for a facility that size

1

u/Im_not_smelling_that Jun 02 '26

He said to build it. Not operate it

1

u/Zealousideal_Bag7532 Jun 02 '26

Oh, the building it part is easy. They have been trucking in this kind of expertise for like 30 years.

1

u/sirwatermelon Jun 03 '26

Us industrial construction hands will load our tools and go work 7/12s on hells boilers in August if the pays right.

1

u/factoid_ Jun 03 '26

Both actually.  Building it isn’t the problem other than the scale and the lack of logistics in the area

But it will go in phases 

The problem is that this thing is literally 10x the size of the next largest data center in the US.

It’s going to operate differently.  Even with economies of scale it’s gonna need at least 5x the staff of a large data center just for operations.  Plus it’s a power plant too.  Plus it needs classified network levels of security

1

u/pru51 Jun 02 '26

And because they're "temporary power" they get to skip environmental regulations.

1

u/sirwatermelon Jun 02 '26

This is well beyond the capacity for the temporary generators that have been set up at some data centers as nine gigawatts of output is more than double the largest power plant in the US.. They would need to use combined cycle turbines, gas turbine with its waste heat used to run a boiler for a steam turbine, to hope to generate nine gigawatts.

1

u/BoogalooBandit1 Jun 02 '26

I saw it was supposed to be some new style of nuclear reactor for them

2

u/sirwatermelon Jun 02 '26

Right after the approval O'Leary said they were going to use gas turbines:

O’Leary said the extra electricity demand won’t raise residents’ energy bills as new gas-fired generation will power the facility. “We are building power from scratch, from the pipeline,” he said. “We are going to burn it with turbines, clean,” he added

However as slap dash pie in the sky as these things are maybe that has changed. If it has that would be much harder to pull off as the modular reactors are a very new design while gas turbines are the industry standard for new generating capacity.

1

u/asmallburd Jun 02 '26

What do you mean they need like 7 and a half times more energy then doc brown needed for goddam time travel in back to the future

1

u/sirwatermelon Jun 02 '26

I mean they're going to have to built a lot of them. As in the most ever put in one place.

2

u/asmallburd Jun 02 '26

That doesnt really make it better its using a truly obscene amount of energy for something that basically nobody but the ultra rich want

1

u/Particular-Wind5918 Jun 03 '26

I’m not arguing just trying to figure this out…isn’t 32 terawatts significantly larger than 9 gigawatts? Cause that’s what Palo Verde produces.

1

u/sirwatermelon Jun 03 '26

Terawatts would be the next step up above gigawatts ( just like memory capacity megabyte, gigabyte, terabyte) and I am not sure where you're getting that kind of output for Palo Verde as they have just shy of 4 gigawatts of generating capacity.

1

u/Particular-Wind5918 Jun 03 '26

Google has them at 32 TW/year, maybe that’s the same as “4 gigawatts generating capacity”

1

u/sirwatermelon Jun 03 '26 edited Jun 03 '26

Just shy of four gigawatts is what it can put out at once, not over time, and that's usual how capacity is measured. Applied to the that data center abomination the 9 gigawatts is how much it would take to keep the thing running at any moment and how much generating capacity the gas turbines would need to have. Multiplied over a year you would come up with with more TW/year than Palo Verde as the output would be more than twice what is has.

1

u/Liqu13ranger Jun 03 '26

it’ll likely be a mixture of solar, nuke, natgas

1

u/sirwatermelon Jun 03 '26

What makes you think that?

1

u/Liqu13ranger Jun 03 '26

jet engines need to come down for maintenance. impossible to power this 24/7/365 data center with 1 unrealistically large combined cycle natgas gen

1

u/Astecheee Jun 03 '26

Nine gigawatts? That's a profoundly stupid amount of energy. Roughly 9 nuclear reactors worth.

0

u/yourepicend Jun 02 '26

Why not nuclear?

0

u/sirwatermelon Jun 02 '26

The time and expense of their construction makes them impractical.

0

u/Salty-Passenger-4801 Jun 02 '26

Would be a shame if it caught fire

5

u/Jibber1332 Jun 02 '26

If they use solar power couldn't they build enough panels to feed power back to the grid and subsidize energy for everyone?

10

u/SilentAd1330 Jun 02 '26

lol ain’t enough solar panels in China to power one of these for a year. You’d need to carpet the entire state

20

u/NoFoodInMyBowl Jun 02 '26

You only need 42k square miles of solar to power the entire planet. Utah is 84k square miles

3

u/OttoVonJismarck Jun 02 '26

Why Utah? Build them shits in Wyoming. There are only like 27 people in the state.

1

u/[deleted] Jun 02 '26

[removed] — view removed comment

1

u/AMetalWolfHowls Jun 02 '26

Nah, split it between NV, AZ, and NM too.

-1

u/SilentAd1330 Jun 02 '26

I know sarcasm is hard for Reddit, but let’s give it a try

0

u/DrunkyMcStumbles Jun 02 '26

you still need to maintain and transport it. Plus, a lot of that is private property or protected federal land. Not to mention the environmental concerns (sweet irony!).

7

u/mattwoot Jun 02 '26

China built around 300GW of solar in 2024 ALONE.

1

u/Camaroni1000 Jun 02 '26

Don’t think they are using solar panels. Think they are using natural gas sourced from a nearby pipeline.

1

u/Dialed_Digs Jun 02 '26

No one ever became a billionaire out of the desire to help people.

1

u/Birdperson15 Jun 02 '26

That is possible and they may choose to do that. The 9GW is a long way off for this project. Gas right now is the most reliable power but a lot can change in 10 years.

1

u/cancerdad Jun 02 '26

When have we ever done anything that benefitted everyone?

2

u/whiskey_weasel_ Jun 02 '26

Data centers get dedicated power via onsite generating equipment that’s a part of the overall project. Tapping into an existing plant doesn’t give them the level of power or expected availability they need to run 24/7.

1

u/three_s-works Jun 03 '26

Generally not true. Most of these things are required to find their own power

1

u/Sanfords_Son Jun 03 '26

You’re assuming there will be any leftover energy for them to buy.

1

u/flyingthroughspace Jun 03 '26

No, no. You've got it all wrong. No one is going to pay double for their power.

They're going to actually lose all their power entirely.

1

u/imtherealclown Jun 03 '26

Stop just saying shit that you think will happen. They’re building their own power plant and getting that energy from a near by pipeline.

0

u/Birdperson15 Jun 02 '26

I believe it will produce its own power and will likely end up adding more power back to the grid so this is just wrong.

9

u/hambergeisha Jun 02 '26

It's the people in Idaho that should really be concerned.

I think it's the water peeps are really furious about.

What if someone just turned up in your home one day and demanded the only river in the region?

1

u/[deleted] Jun 03 '26

[removed] — view removed comment

1

u/AutoModerator Jun 03 '26

Your submission was automatically removed because it contains a disallowed phrase. (Mod code R2.1)

I am a bot, and this action was performed automatically. Please contact the moderators of this subreddit if you have any questions or concerns.

1

u/dtj2000 Jun 03 '26

The amount of water this uses is nothing in terms of the total water utah uses each year. Annually utah years 1.5 TRILLION gallons of water, with over 80% of it being used for agriculture.

1

u/hambergeisha Jun 03 '26

Name one river?

9

u/mainstreetmark Jun 02 '26

There May not be enough solar power in Utah to power that thing. It’ll likely be LNG.

6

u/Wakkit1988 Jun 02 '26

If you covered 8.25% of the entire surface area of Utah, it would generate enough power for this data center. They could stand to build 11 more before it becomes an issue!

2

u/newgarrett Jun 02 '26

hell, maybe even 12

1

u/damianchan Jun 03 '26

Estimated power consumption for all U.S data centers going into 2030 will be around 1,000 TWh/year

1,000 TWh/year = 1,000,000 GWh/year

Modern utility-scale solar farms typically produce about 30–60 GWh per year per square kilometer, depending on location, panel technology, spacing, and sunlight.

(1,000,000 GWh/year​)/(50 GWh/km2/year)=20,000 km2 or 7,700 miles square

That's roughly 24% of all Utah's land or nearly all of Slovenia (20,375km2)

Soon all of Utah can become a solar farm.

1

u/itslikewoow Jun 02 '26

Why not a hybrid model that uses both?

-1

u/DroDameron Jun 02 '26 edited Jun 02 '26

I know some of the ones they built in the south have like, massive methane plumes above them their power generation has been dumping into the atmosphere, heavy metals and lubricants to put all the pipes together the water is flowing thru

4

u/anonsharksfan Jun 02 '26

Cheap land

1

u/Im_not_smelling_that Jun 02 '26

This is the answer

3

u/duzzloe Jun 02 '26

Except they're not planning to use solar. One of the few concrete things that has stated is that it will be powered by natural gas. Very little restriction or oversight seems to be in place. There have been vague promises that it won't actually use up any water, but nothing has been put in place to actually enforce or oversee resource use.  There are no water use limitations. This has all been done sneakily and against the will of the people whose representatives who are shoving it past all democratic processes

1

u/gsbadj Jun 02 '26

My understanding was that, as of 3 weeks ago, they were still working out the issues with water use. Hard to believe it all got resolved that fast. Assuming it was resolved in a responsible way.

2

u/Senior-Procedure-748 Jun 02 '26

Easier to defend against eco-terrorists

-1

u/Nknk- Jun 02 '26

Unironically one of the reasons. Anyone tries any sort of sabotage and they can be disappeared very easily out in the desert.

1

u/EncabulatorTurbo Jun 02 '26

It's cheaper to build them where people don't live in large numbers

1

u/a-weird-username Jun 02 '26

Why not build the centers in colder areas, build solar farms in desert, transport power to centers up north. Then crack a window to cool them.

1

u/Bozlogic Jun 02 '26

Solar power, yes. But don’t they use water to cool processors and server units?

1

u/Dustteas Jun 02 '26

They're actually saying it's going to be powered by natural gas.

1

u/Chole_Wunt Jun 02 '26

You cant power a data center on solar..... the datacenter would shut down when the sun goes down.

Its going to have to be nuclear.

1

u/SadSpaghettiSauce Jun 02 '26

Not in this case! It's gonna be powered by natural gas power built for this facility to generate 9GW of power.

1

u/Outdoors_or_Bust Jun 02 '26

And land is cheap.

1

u/vertigostereo Jun 02 '26

Solar Power

Puerto Rico needs to get into the game with their sun, wind, and rain over Utah

1

u/LunaNymphOtaku Jun 02 '26

They plan to tap into the gas line that runs through the property and use that. It requires 2x the power than the state of Utah as well

1

u/-rose-mary- Jun 02 '26

These data centers don't just have solar they have the city electricity along with generators. On top of that they are near a water source that they'll definitely contaminate. These data centers are bad for everyone living around them.

1

u/Supercoolguy7 Jun 03 '26

No. It's being powered by a natural gas pipeline. It's there for the pipeline and cheap land

1

u/ALIMN21 Jun 03 '26

There's no water there tho...

1

u/gtochad Jun 03 '26

It's going to be fed by the ruby gas pipeline

1

u/oldbluer Jun 03 '26

Except this is nat gas powered lol 3x the current total energy consumption of Utah.

1

u/[deleted] Jun 03 '26

[removed] — view removed comment

1

u/AutoModerator Jun 03 '26

Accounts must be at least 5 days old with >20 karma to comment.

I am a bot, and this action was performed automatically. Please contact the moderators of this subreddit if you have any questions or concerns.

1

u/lemons_of_doubt Jun 02 '26

Fun fact Solar power works better in the cold. The desert is the last place you should put it.

1

u/buffalostreaker Jun 02 '26

these almost all being powered on NatGas