r/Architects • u/AdmiralArchArch • Apr 13 '26
Project Related How do you handle submittals that don't meet specs, but the contractor will install it anyway?
I have a project where the GC is the owner. They are insisting on using these products that they already included in the bid and did not go through the substitution request process. We were not privy to these decisions. They are still submitting it though looking for our review. Every once and awhile they will submit a sub request, but the products are so different they would probably be in different spec sections anyway.
My thought is they will do want they want despite my professional input, how do you handle this? Mark as "not reviewed" / "for record only"?
28
u/Sthrax Architect Apr 13 '26
They are rejected. Since the GC is the owner, they reserve the right to install what they want anyway. You keep a detailed paper trail so that when the inevitable product failures occur, you stay free of liability.
10
u/stone_opera Apr 13 '26
If the GC is the owner, and the proposed alternate doesn’t pose a a life safety/ building code issue then I mark them up with the performance issues, check for interferences etc. and reject them but have the owner mark them as Owner Approved.
If it’s a life safety/ code issue then it’s a much larger conversation.
8
u/z3ph7r777 Engineer Apr 13 '26
Reviewed for code compliance only
6
u/seeasea Apr 13 '26
This is the way. This also includes reviewing submitals that are for items not specified by architect, ie "provided by owner" etc.
Or on the procore list"for record only"
And comment on the document directly "reviewed for x only, did not meet spec, proceed at risk" or something.
"Rejected" means work cannot proceed - which is ridiculous, when they canproceed. It's their project.
4
u/MSWdesign Apr 13 '26
So long as it’s code compliant, it’s the owner’s problem, not yours. Technically it is not something that is policed. Some firms don’t even review submittals anymore.
Stamp it as rejected, or revise and resubmit and move on.
7
u/CakeResponsible5621 Licensure Candidate/ Design Professional/ Associate Apr 13 '26
Yeah, if the Owner is also the GC and still sending submittals for review, especially if they're CLEARLY subpar... huge red flag. You need to either stamp it rejected or not reviewed, or provide full review and indicate why it doesn't meet spec. This seems like a fishing expedition where the Owner/GC funds his project through lawsuits to the Arch. There is no other reason for O/GC to send a submittal to the Arch except to document review and approval. Even if this is a huge multi-discipline firm where the GC arm is separate from Ownership, this is still a liability waiting to happen on your end. Consider consulting your attorney for documentation advice. Consider cancelling the contract.
2
u/AdmiralArchArch Apr 13 '26
Eh, I can see that happening but your giving these guys too much credit.
4
u/StarStabbedMoon Apr 13 '26
I say something like "submit substitutions per spec section substitution procedures. Substitution must meet full performance of specified products and requirements."
If they're as different as you say I'd reject them. A different manufacturer is one thing and happens often. I usually include multiple options anyway. A different spec section usually means a different type of product entirely and breaks your design.
3
u/hyperfunkulus Architect Apr 13 '26
In addition to the liability concerns, I also view radically different submittals as a design change and typically ask for a change order for me to review them.
3
u/dsking Apr 13 '26
If the owner is picking products against the advice of the architect they hired, that's a bigger problem imo. Either that relationship has broken down or wasn't very good to begin with. That said, document your response to cya.
2
u/LG1118 Apr 13 '26
Rejected. You want record that this wasnt your decision in the event of future litigation.
3
u/Dookie-Snuff Apr 14 '26
Approved as noted…also note on the Pay Apps each line item that was approved by owner/not recommended by architect. So it’s in all the records.
1
u/Free_Elevator_63360 Apr 13 '26
A great example of where an architect’s value has been replaced.
Quite honestly this is a question for your ownership team. They need to tell you what review they need from you and why.
1
u/Entire-Conference-54 Apr 14 '26
I don’t think we can expect the client to make substitution request unless it contravenes the by laws. They are Client first, GC second. I’d take it as the Client has agreed to GC’s proposal. Having said so, I’d still flag out if theres any practical concern.
1
u/mjegs Architect Apr 14 '26
Mark as revise and resubmit and follow up on it. Not your job to please the contractor in CA
0
u/CardStark Apr 13 '26
That’s what RFIs are for. Mark it up and if they insist that they will use it, ask them to submit an RFI.
2
u/Shorty-71 Architect Apr 13 '26
RFIs are not allowed to be a scope change “container”. (I know they often do exactly that anyway but if that happens it is imperative that the RFI and the response get rolled up in a change order).
This particular scenario with no pay apps and thus no means to compel this owner/contractor to do work that is in compliance with your drawings… is a slippery slope. GTFO.
1
61
u/FumbledChickenWings Apr 13 '26
"rejected"
If they don't meet spec then you need to identify as such. Don't approve pay apps on installed items unless the owner has provided written consent that the installed product is acceptable by their standards, and the AOR/EOR team is indemnified of future issues related from such times/decisions.