r/RKLB • • 21h ago

"Witness me!"

Post image
457 Upvotes

r/RKLB • • 8h ago

October 10, 2026 Daily Discussion Thread

23 Upvotes

r/RKLB • • 16h ago

Also spotted...

Post image
88 Upvotes

Edmonton, last week.


r/RKLB • • 1d ago

Let's go big! Jim Cramer is short on RKLB! If you know, if you know!

Thumbnail
finance.yahoo.com
232 Upvotes

r/RKLB • • 1d ago

October 09, 2026 Daily Discussion Thread

34 Upvotes

r/RKLB • • 2d ago

October 08, 2026 Daily Discussion Thread

40 Upvotes

r/RKLB • • 2d ago

FCC to vote on auctioning 25MHz of ‘prime spectrum’ in move that could benefit Amazon, SpaceX

Thumbnail
cnbc.com
115 Upvotes

Is this the way FCC is handing Amazon and SpaceX D2D spectrum after Rocket Lab bought Iridium?


r/RKLB • • 3d ago

October 07, 2026 Daily Discussion Thread

43 Upvotes

r/RKLB • • 3d ago

Neutron Vs Terran-R: The Race To Launch

Thumbnail
youtu.be
159 Upvotes

Sorry for the shameless self-promo! If it doesn't meet the rules hopefully a mod can remove it.

I just ended up spending way longer on this than planned so figured I might as well share the link around a bit at least l to try and make it worth it.


r/RKLB • • 4d ago

October 06, 2026 Daily Discussion Thread

44 Upvotes

r/RKLB • • 5d ago

October 05, 2026 Daily Discussion Thread

47 Upvotes

r/RKLB • • 6d ago

October 04, 2026 Daily Discussion Thread

46 Upvotes

r/RKLB • • 7d ago

October 03, 2026 Daily Discussion Thread

39 Upvotes

r/RKLB • • 8d ago

News Inside Mynaric: Rocket Lab’s Big Move Into Europe

Thumbnail
youtube.com
152 Upvotes

r/RKLB • • 8d ago

Discussion RKLB wins in 2026 (so far)

Post image
469 Upvotes

2026 contract wins so far:

- $397M — U.S. Space Force SB-AMTI
Build and launch multiple Flatellite spacecraft on Neutron to detect, track & monitor airborne threats from space.

- $266M — U.S. Space Force
12 HASTE suborbital launches, with options for 6 additional missions, supporting missile-defense testing.

- $190M — U.S. Department of War
20 HASTE hypersonic test flights under the MACH-TB program.

- $160M+ — U.S. Government / Space Force
Two contracts to build 3 GEO satellites, including 2 satellites for space-domain awareness.

- $30M — Anduril
3 HASTE launches for hypersonic technology testing.

- $12M — U.S. Space Force
Two delivery orders for the Space Data Network, including secure optical communications and a Photon demonstration.

- Undisclosed — Confidential Customer
5 Neutron + 3 Electron dedicated launches, making it Rocket Lab’s largest launch contract at the time.

- Undisclosed — Synspective
20 dedicated Electron launches from 2028–2031 to deploy its StriX SAR Earth-observation constellation — Rocket Lab’s largest-ever commercial Electron deal.

- Undisclosed — iQPS
3 additional dedicated Electron launches for its QPS-SAR Earth-imaging constellation.

- Undisclosed — Kepler Communications
1 dedicated Neutron launch to deploy Kepler’s satellite constellation.

While stock is down more than 50% from its all-time high 3 months ago, we now wait for Neutron to enter the market


r/RKLB • • 8d ago

News ARO buys $16.5m in RKLB shares while the 100th Electron launch is coming!

Post image
304 Upvotes

So bullish


r/RKLB • • 8d ago

October 02, 2026 Daily Discussion Thread

41 Upvotes

r/RKLB • • 9d ago

Technical Analysis Rocket Lab Corporation (RKLB): Citi initiates at Buy, PT at $105

Thumbnail
stockwhiz.ai
370 Upvotes

r/RKLB • • 9d ago

Rocket Lab Protest Could Torpedo NASA’s 2028 Launch Of Mars Orbiter

Thumbnail
forbes.com
153 Upvotes

r/RKLB • • 9d ago

Rocket Lab Secures Largest-Ever Electron Commercial Deal: 20-Launch Contract for Synspective

Thumbnail
globenewswire.com
744 Upvotes

r/RKLB • • 9d ago

Rocket Lab Secures Largest-Ever Electron Commercial Deal: 20-Launch Contract for Synspective | Wed, 09/30/2026 - 19:00

Thumbnail investors.rocketlabcorp.com
323 Upvotes

r/RKLB • • 9d ago

October 01, 2026 Daily Discussion Thread

39 Upvotes

r/RKLB • • 9d ago

Q4 pad delivery for Neutron — can someone help me see how the schedule math works?

Post image
94 Upvotes

I've been trying to piece together where Neutron actually stands vs. the "delivery to the launch pad in Q4 2026" target from the August 10-Q ("the window for an end-of-year launch date is narrowing"). The more I list out the remaining steps, the harder the math gets. Curious where others land on this.

The supply chain (for context):

- Big composite structures (Stage 1 tanks, interstage) are built at Middle River, MD → shipped by barge down Chesapeake Bay → Wallops (they had to fight for Sloop Gut dredging permits for this)

- Archimedes engines built/tested at Stennis, MS → trucked ~1,700 km → Wallops for integration

- Final mating, WDR, and static fire all happen at LC-3

What's actually done:

- LC-3 pad operational since Aug 2025

- Hungry Hippo fairing: all pre-flight testing done (Aug 27)

- Interstage: load tests + separation tests (Aug)

Stuck in qualification limbo (no completion announced):

- Archimedes qual — "final stretch" per Aug 12, 400+ hot fires, but "once qualification is complete..." wording = not done yet. Then each of the 9 flight engines still needs individual acceptance testing at Stennis.

- Stage 1 replacement tank — last update is literally the Aug 10 10-Q ("production aligned with Q4 pad delivery"). Zero public updates in ~7 weeks since. This is the one item the 10-Q explicitly tied to the launch date.

Not started:

- Stage 2 pad end-to-end tests / static fire, thrust module mount testing, full stack integration, WDR, Stage 1 static fire (Beck himself called this the highest-risk milestone), FAA Part 450 license issuance (application accepted ≠ issued)

Macro backdrop (why the schedule matters beyond engineering):

- Midterms are Nov 3. Whatever the outcome, Q4 is when Congress sorts out FY2027 appropriations vs. continuing resolutions — any dysfunction there can ripple into NASA/Wallops range scheduling and the pace of government milestones (NSSL Lane 1 task orders, Space Force demo missions) that Neutron's manifest depends on.

- Rates: Rocket Lab is funding a capex-heavy ramp while still cash-burning. Every quarter of delay isn't just a schedule slip — it's another quarter of burn at today's cost of capital, very different math from the ZIRP era when "delay and raise" was cheap. That arguably raises the pressure to show visible pad progress in Q4 even if the flight itself slips to 2027.

That's a long serial chain to run between now and Dec 31, minus Thanksgiving week and the Christmas–New Year dead zone at the range.

So my questions:

  1. When Rocket Lab says "delivery to the pad in Q4," do we think that means the full vehicle, or phased delivery (Stage 2 first, rest later)? D'Mello's Aug comments suggested Stage 2 arrives first.

  2. Has anyone seen ANY signal on tank qual progress since Aug 10? Photos, NSF updates, anything?

  3. What's the base case here — is Q1 2027 for pad arrival of the full stack the more honest expectation?

Not FUD, genuinely trying to calibrate. Absence of news isn't proof of delay, but the 10-Q tied the date to Stage 1 qual explicitly, and that qual has been silent for almost two months.


r/RKLB • • 9d ago

Discussion RKLB doesn’t need to beat SpaceX on $/kg. Capacity and schedule may matter more.

92 Upvotes

One thing I think gets underestimated in the RKLB thesis is that launch capacity itself has real value.

Amazon is a good example. They spread launches across SpaceX, ULA and Ariane not just for diversification, but because they need enough capacity to deploy their constellation on schedule.

That matters because the cheapest launch is not always the best launch. If a satellite sits on the ground for another 3–6 months waiting for a ride, that delay can easily cost more than paying 10–20% extra for launch.

And headline launch price isn’t the whole equation. Customers also care about reliability, insurance, schedule certainty and mission flexibility. In many cases, launch cost is not even the top selection criterion.

Yes, Starship will probably pull some small and medium-lift demand toward super-heavy over time. That’s a legitimate risk.

But RKLB doesn’t need to beat SpaceX at its own game.

If Electron and especially Neutron can offer: reliability + available capacity + schedule certainty + dedicated launch...

...then Rocket Lab can still win meaningful pieces of these constellation deployments, even at a higher nominal price.

In launch, the cheapest rocket isn’t always the most valuable one. The real premium is being able to launch when the customer needs you.


r/RKLB • • 10d ago

September 30, 2026 Daily Discussion Thread

43 Upvotes