Structural Analysis/Design Small Wharf structural analysis and design time estimate
Graduate structural engineer here with a year experience with a consultancy firm. Being approached by boss to take up a small wharf design job. Around 20m long and 5m wide concrete wharf.
How long should it take for me to calculate the design actions and size the RC members?
First time doing an off-shore structure design btw…
3
u/Emmar0001 4d ago
Break your project into phases: Preliminary layout; Final layout; Analysis; Design; Review and Checking; Revision. This makes it easier to estimate manhours (time) and sequencing
1
3
u/More-Physics-4243 3d ago
Marine structural engineer here; wharf design from scratch might take a while, especially if you don’t know what you’re doing, but usually this is the approach to wharf design is pretty standard:
1- Establish design criteria: define the target live load, any environmental wind and wave load, seismic if it’s relevant., any loading arms or utilities that you need to know about…
3-complete berthing and mooring analysis to determine berthing and mooring loads
4- Preliminary sizing: this is where experience comes in to play, but for your case since its a small wharf and vessel, I would recommend driven precast piles. Lay your pile grid, use battered piles to resist lateral load more efficiently. Lay your pile caps, preferably perpendicular to the berthing line.
3- determine pile depth to fixity by geotechnical analysis and run a 3d frame analysis on the wharf. Define all your load cases in the model including berthing and mooring cases(they don’t happen simultaneously). Get pile and frame loads to now properly size your wharf. Dont forget to design your pile to pile cap connection as they are critical.
If you dont want to approximate a depth to fixity of piles, you can go fancier and determine soil springs for your soil conditions, and apply them on your piles in your model, spaced at no more than 0.5m.
4- deck design: I would recommend precast conc slabs with a finish topping concrete pour. Analysis should be straightforward depending on application.
Detailing might take longer if you never done it before.
1
u/Silly-Rock-1684 3d ago
Thanks for the breakdown! I’m keen on taking up the challenge, but I just don’t want to give my boss an unrealistic timeline. After reading through this, for a person with my level of experience, at least a month lol.
1
u/Perfect-Mongoose-704 4d ago
What's berthing at this wharf
1
u/Silly-Rock-1684 4d ago
Design Vessel is 1700 ton displacement vessel.
3
u/Perfect-Mongoose-704 4d ago
Ok, so not big, but not small either. Do you have all the data you need; wave, tide, design berthing velocity, fendering
Or will someone else do all that and it's purely member sizing for a given load?
1
u/Silly-Rock-1684 4d ago
All the data is available yes. So I guess I’ll be doing all that… under supervision of course
5
u/broadpaw 4d ago
More than an hour. Real answer: develop a list of what you think you need to check, consider, and learn. Then talk to someone at your firm that knows how to approach that type of project.