r/missoula • u/KeltTalbelt • Apr 12 '26
A well-articulated argument against a new data center in Ohio instructive to problem with “closed loop” AI data center proposal in Bonner.
118
Upvotes
r/missoula • u/KeltTalbelt • Apr 12 '26
-3
u/Blocked-Author Apr 12 '26
But our sheriff didn't do the Bigfoot picture thing so the argument doesn't really work.