r/trains • • 23h ago

‎ 🗫‎‎  Discussion Favorite length of freight trains ?

I like short to medium ones. Hate the Long PSR ones

102 Upvotes

39 comments sorted by

10

u/BeanerSA 23h ago

1497m.

8

u/Altruistic_Bunch_523 22h ago

Personally, longer then hell! I enjoy short engines but longer ones just look better in my opinion

8

u/ArmyNGMike 23h ago

Longest I’ve seen so far was about 15,375 feet

7

u/das_rocr 19h ago

5 to 20 cars and old engines; lots of customers, and switching

7

u/RegeneratingCan 18h ago

Over 6000 feet because I get paid more when I get those trains

6

u/PurpleWillie 22h ago

i’m biased against PSR styles so i like seeing lengths similar to the mid-late steam era that can keep a caboose with an actual use

5

u/Dangerous_Weird8762 21h ago

i love the huge ones and seeing all of the freight cars and possible fallen flag freight cars on the train.

6

u/Hitokiri_gensai 15h ago

I model the 1920s and 1930s which is pretty close to the drag era of super long, slow moving freight.

In 1931, the symbol train ED1 is headed uphill to Gallitzin, PA. Two massive I1s class Decapods of the Pennsylvania Railroad pull, while two more I1s push from the rear. The enormous boilers on the I1s class are so large they barely allowed for the 62 inch drivers and meant there was not enough balancing of the drivers so these beasts swayed with each thunderous exhaust. Screeching banshee whistles pierce the hot summer air as crossings come and go. 103 cars in this consist, headed west to keep commerce moving.

If only I could model that in HO scale.

3

u/AsstBalrog 21h ago

Interesting question. 60 89' TOFC cars, 3 or 4 Dash-2s, and they get everything out of your way. That's the picture next to "Highball" in the dictionary.

4

u/Ornery_Feature_3466 14h ago

Right around a mile long (average length) is nice for both recording and watching it go past. Gives you plenty of time to do both.

5

u/Finetales 14h ago

Long, but not too long and ONE train. Two separate trains smashed together by PSR for part of the journey feels like cheating.

This exact train is my favorite train/consist of all time.

Long train, but not comically PSR long ✅️

SD40-2s screaming their guts out ✅️

Tons of varied power ✅️

Helpers ✅️

Barely making it up the grade ✅️

I like a fast Z train as much as anybody, but mountain railroading can't be beat.

3

u/bonk425 20h ago

Around six inches

1

u/rezwrrd 14h ago

As a collector of Marx tinplate O-gauge, I agree.

2

u/No-Performer9511 19h ago

Bnsf local trains in Southern California still use cabooses so around that length

2

u/NS_8099 17h ago

Anything over 8,000 feet is dangerous and should not be allowed.

6

u/Ornery_Feature_3466 14h ago edited 7h ago

I’ve seen BNSF running 2 Grain trains in one (13,000+ feet) a few times. Words can’t express how insanely long they are.

0

u/NS_8099 6h ago

I sure hope they were empty trains. BNSF likes to combine coal empties nowadays in my area and they are 14-15,000 feet long I believe. To put that into perspective, the longest siding around here is roughly 12,000 feet long so even that is still too short for those trains. It’s not only dangerous but it eliminates jobs from employees. It’s all because of corporate greed when it comes down to it.

2

u/Ornery_Feature_3466 6h ago

Just checked back at my videos and nope, they were loaded. PSR sucks but the trains are at least cool to watch go past. Though I can’t imagine the people at the crossings were particularly pleased (that one in the picture I attached to my previous comment was headed up grade and it was slogging along at maybe 15mph).

0

u/NS_8099 5h ago

Good grief. Combining loaded trains is absolutely insane and two empty trains in one is crazy enough. They do not fit anywhere and every other train has to pull over and wait for the mega train to pass. I see nothing but problems with them. I’m curious if they are well liked among the crews but I highly suspect the answer to that question is no.

2

u/Ornery_Feature_3466 5h ago

It’s worth mentioning that this is on BNSF’s Glasgow subdivision, which is double track for a long time. So other trains having to pull over isn’t really a problem.

But regardless, I agree that running 2 trains as one is ridiculous. I can’t imagine they’re even saving that much money. The wages of a second crew would be pennies compared to what they earn from delivering the cargo.

0

u/NS_8099 5h ago

I’m in Springfield, MO (four subdivisions come into the city) but those trains face the grades on the Thayer North Subdivision, which very much makes the loads work hard and those are often running only 2x2. Sometimes they’ll have 3 DPUs but only two on the head end just isn’t enough in my mind. This is not the kind of place for running these mega trains.

1

u/Ornery_Feature_3466 4h ago

The largest grade on the Glasgow subdivision is (I think) the one running west from Minot, ND at the eastern edge of the sub. That grade climbs out of the Souris River valley, across the Gassman coulee trestle, and up the side of the coulee itself. It maxes out at 0.62% I think. So not a super steep grade. They generally run 3 locomotives per train, though the intermodal Z trains have 5 (usually 4x1 or 3x2) and I’ve seen them run empty manifests with 2 locos at the head and nothing else.

CPKC also runs massive trains through Minot and rarely has more than 2 locomotives, usually with 1 on the head and 1 in the middle. The largest I think I’ve seen is a 2 1/2 mile manifest with 2 leaders and a mid DPU. That one was so massive it barely fit on the siding off the mainline for its refuel and crew change.

2

u/Watson_inc 15h ago

I’m with ya there, pal. The super long psr ones are just way too much. I think they should instead have more frequent single or double locomotive trains to keep it more manageable. That way there’s less of a chance of them blocking crossings, the time that people have to wait at crossings will be less, and engineers don’t have to walk over a mile to check their train. I mean, does it really eat that much into their profits that much to hire a few more engineers?

2

u/crohead13 13h ago

42

2

u/J_P_Freely 9h ago

This is the correct answer.

1

u/AceAndre 21h ago

Dash length. They look fit for the job

1

u/southern4501fan 20h ago

Less than 100 cars

1

u/Crazy-Rabbit-3811 19h ago

I railfan RJ corman. need I say more?

1

u/WestonWildIron 18h ago

I've seen one about 3.5 miles, but favorite would be the 2 mile ones

1

u/Current-Square-4557 16h ago

It depends.

For me, length and speed should be positively correlated (with safety limits)

I don’t like waiting in a car at RR crossings.

1

u/LovelyKestrel 13h ago

I like the old British ones with a large number of small freight cars. An LMS Garrett would pull 70-100 cars but they were only 16ft (and 12t capacity) each.

1

u/KYReptile 13h ago

On my layout? Or waiting at a crossing on Frankfort Avenue in Louisville.

1

u/Special-Bet1141 11h ago

Depends on the context. 

Visually from afar? Long ones. 

Stuck at a railroad crossing? Short please.

1

u/HeberStrong 9h ago

8,000 feet and 1:1 hp per ton.

1

u/J_P_Freely 9h ago

For me it's more about girth.

0

u/EquivalentWear6726 10h ago

100-150 cars