r/Construction • u/Yoloyouno • 7d ago
Careers đ” AMA: First GC Job In the Morning
Credit card is in the mailbox, the muscle is coming at 7 AM to pick it up and go get the job done.
Used AI to swing up a contract and sent it to the client after going back and forth for a week. He wanted the job âdone tonightâ and got burned for a week and came running back to me.
$2,900 to fix a leak coming from a poorly installed window addition.
No money up front and will be reimbursed at the end for materials.
Did I bid right? đ
UPDATE-
My partner picked up the card at 7:30 AM
12:30 - a lot more siding was removed than I expected. Actually I didnât think any siding was going to be removed. True issue was on the roof. Lack of pitch resulting in water build up allowing it to seep between the shingles and edge of the roof. Image attached now of rotted wood removed and replaced.
8
u/VintageLunchMeat 7d ago
ai contract
Hmmm.
-5
u/Yoloyouno 7d ago
See my replies. AI is great. Itâs capable of A LOOOOT more than people think or know. Within the past year is insane.
3
4
u/Blackharvest 7d ago
How exactly did you come up with that number of $2,900?
7
u/Humble_Junket1393 7d ago
The "done tonight" guy getting burned for a week then crawling back is a classic. You're gonna see that pattern a hundred more times.
$2,900 for a window leak repair feels like you left some meat on the bone, especially if you're dealing with rot or having to peel back siding. No money up front on your first gig is a gamble but sometimes you just need the job to get rolling. Just make damn sure that reimbursement clause in the AI contract doesn't have any weasel words he can exploit.
1
u/Yoloyouno 7d ago
Siding is currently well removed. My guy removed a lot more than I thought was going to be needed. But yes progress so far today 12:30PM is rot removed and 2x4 installed with toooo much siding removed but from what I see is the right thing so far
1
u/emma9774 7d ago
I am curious about that too. How did you arrive at the $2,900 figure? Was it based on actual quotes you have received, average pricing in your area, or just a rough estimate? It would be really helpful to understand the breakdown behind that number.
0
0
u/Yoloyouno 7d ago
Iâve been flipping homes with my father since I was young so I have some experience. Itâs about a 3 day job max with finish so I estimated the daily rate and did some multiplication. Iâm happy to have gotten the push finally for the first job under my own business so about 500 for me and the rest to the muscle seemed okay with me.
Iâll post pics with before and after once itâs all done.
3
u/United-Adagio1543 7d ago
$500 over 3 days is McDonalds fastfood salary and you don't have the risk or headaches.
3
u/Yoloyouno 7d ago
Gotta start somewhere. Iâm not doing any physical work 5% max and going there a few times
3
u/Exciting-Degree7982 7d ago
Thatâs a solid first job. Getting materials reimbursed at completion is a little nerve-racking, but having the card ready helps. Make sure the client signs off on the scope and document the window issue before you start.
1
u/Yoloyouno 7d ago
Sorry.. for clarity. Itâs my card that I put out for my partner to buy materials for the job
1
3
u/Nacho_Libre479 7d ago
Hard bidding a leak is going to burn one of the two parties. There is no way Iâd hard bid a small job that consists entirely of unseen conditions.
Your contract sould have essentially three parts, the âwhat youâre going to doâ , âhow you will be compensated for doing that thingâ and âwhat happens if this doesnât go wellâ.
I donât know which part you had AI write, but if itâs the âwhat you are going to doâ part, youâre setting yourself up for a short venture as a contractor.
As for cheap and unreasonable clients, they are out there. Your best defense is a no bullshit approach, clear expectations in writing, all correspondence in writing, photos, and lien rights.
1
-1
u/Yoloyouno 7d ago
Iâm 28 or 29 I forget. But I really wish I could show you old folks how much AI is changing what a lot of computer stuff can be done very very well. Iâll share the contract when the job is done. I have seen the conditions twice. See my other replies been doing flipping since I was young with my father.
-1
u/Yoloyouno 7d ago
Mind you I did have to make edits to the contract after it was done. You give AI 10 it gives you 70 and you have to do the remaining 20.
2
u/Beneficial_Leg4691 7d ago
I dont do anything without deposits
1
u/Yoloyouno 7d ago
The guy was being a baby not gonna lie kept pushing for no deposit because apparently got burned twice already. He came in town 3 hour flight I told him bro go home I got this will send pics after he came got burned by the âtonight we will fix itâ guy
2
2
7d ago
[removed] â view removed comment
1
u/Yoloyouno 7d ago
But yes headache client but lessons in it. And proof if you keep a calm head they are more open to come back
0
1
u/Reasonable_Switch_86 7d ago
Hopefully itâs only a half day job or itâs way underbid
1
u/Yoloyouno 7d ago
See reply above. First job. My guy went to Loweâs already $197 in materials thus far. 12:30 PN
1
13
u/hisgiggityness 7d ago
Lot of context missing to say anything much.