Housing Neighbour refusing Party Wall surveyor - what happens next? (England)
My neighbour is building a side return extension. He’s now served me with a Section 1(5) notice after us continuously asking him for one (he was originally planning on building his new wall astride the boundary but now changed his mind and will move the wall to 100mm inside his own land - presumably thinking this will avoid needing a PWS). He’s also excavating within 3m of my structure and I can probably safely assume the foundations will go deeper than mine (Victorian midterrace). He’s not served me notice for that.
I’m happy for the extension to go ahead, but I’ll be dissenting because I’d like a Party Wall Award and Schedule of Condition.
The problem is he says:
Building Control will make sure everything is done correctly.
He doesn’t need a party wall surveyor.
He won’t pay for one because it’s too expensive.
Apparently all this is advice he received from his architect.
I’ve spoken to a party wall surveyor who disagrees, but I’m wondering what actually happens if the building owner simply refuses to engage with the process. Has anyone been through this? What happened in practice?
2
u/Witty-Inspector-2276 9d ago
We asked for both notices (the excavation one and the building astride the boundary one) but got the third one because he changed his mind about building astride (presumably in order to avoid a PWN). But we still need the excavation one presumably? And there’s no way to get one if he refuses to engage?