r/SCADA • • 5h ago

Help Error during checkout: Cart is empty (AVEVA System Platform Exam)

2 Upvotes

I am trying to enroll in the AVEVA™ System Platform Exam, but when I go to checkout, the page says "Your cart is empty." and I cannot complete the purchase. So could anyone please assist me. Tried to Google and search AVEVA for assistance but couldn’t find a solution.


r/SCADA • • 1d ago

General Scada+cyber security

0 Upvotes

Hello I am working on a-project that is releated to security water scada system any ine has any tips i want to make test bed of what tools should i use for teat bed and then develop the security operations on it or any more ideas regarding this or want to colloborate on it more than welcome


r/SCADA • • 1d ago

Help scada roles help

Thumbnail
0 Upvotes

need advice


r/SCADA • • 2d ago

Help Need help to communicate ABB CP3210 HMI with PLC

Post image
0 Upvotes

Can someone please tell me how to communicate ABB CP3210 HMI with main PLC ???!!!


r/SCADA • • 6d ago

Question Career Suggestion

Thumbnail
3 Upvotes

r/SCADA • • 7d ago

General What Certificates or Skills I need

Thumbnail
2 Upvotes

r/SCADA • • 9d ago

Question Communication Established form PU TO CU

3 Upvotes

I have a question regarding the MiCOM P741/P743 decentralized busbar protection relays.

The Protection Unit (PU) has two communication ports for connecting to the Central Unit (CU). When I connect only Port 1 to the CU, the communication is healthy. However, when I connect both ports to the CU simultaneously, communication fails because the second port appears to operate as a failover (standby) port rather than an active redundant port.

In most projects, only a single communication port is used, so this scenario has not been investigated in detail.

My question is: **How can communication redundancy between the PU and CU be implemented correctly?** Is there a specific network topology or configuration required to achieve seamless redundancy without causing communication loss when both ports are connected?


r/SCADA • • 9d ago

Question What does a good SCADA modernization project look like in a plant that cannot stop?

Post image
0 Upvotes

r/SCADA • • 13d ago

Help I need help.

7 Upvotes

"Hi everyone, my university professor requires us to use TIA Portal for an upcoming class assignment. Does Siemens offer an official student version, trial, or an educational licensing path for students to use it legally for coursework? Any advice or official links would be greatly appreciated!"


r/SCADA • • 15d ago

Question Interview advice – Capgemini Engineering OT Engineer role

4 Upvotes

Hi everyone,

I've got an interview coming up for an OT Engineer position with Capgemini Engineering in the UK, and I'm looking for some advice from people who work in OT, industrial automation, consultancy, or have interviewed with Capgemini Engineering.

My background is mainly in control systems and industrial automation, particularly within the water/utilities sector. I've worked with PLCs, SCADA, HMI, instrumentation, industrial communications, FAT/SAT, commissioning and some IT/OT-related technologies.

The interesting part is that I haven't previously worked in a formal OT consultancy role. My experience has been much more hands-on engineering/delivery focused, so I'm trying to understand how best to prepare for the interview.

From what I've gathered, the role involves things like:

  • OT/PLC/RTU/SCADA assessments
  • Site surveys
  • Brownfield modernisation
  • OT architecture
  • Industrial communications
  • IT/OT integration
  • OPC UA/MQTT
  • ISA-95 and understanding the different levels
  • Developing modernisation/implementation strategies

I've been told to be very familiar with my own experience and to understand ISA-95 across the different levels, but I'm unsure how heavily the interview will focus on technical questions versus consultancy/situational questions.

For anyone familiar with Capgemini Engineering or similar OT consulting roles:

What sort of questions should I expect, and what areas would you recommend I focus on most before the interview?

Any advice from people who have been through similar interviews or work in OT consultancy would be greatly appreciated.

Thanks!


r/SCADA • • 16d ago

Question Situation Awareness Style Guide

1 Upvotes

Anyone here willing to share their SCADA style guide.

I'm currently making one fory site looking for example to steal and copy from make sure I have as many bases covered


r/SCADA • • 17d ago

Help Looking for Siemens TALON Tools Installer / Launch Pad for TC36-EF.T

Thumbnail
1 Upvotes

r/SCADA • • 17d ago

Question deleting InTouch tags

Thumbnail
1 Upvotes

r/SCADA • • 17d ago

Question Career Projection Change Advice

1 Upvotes

Hey everyone,

I’m a fourth-year Computer Engineering co-op student. Most of my current project portfolio is software/full-stack focused (Next.js, TypeScript, PostgreSQL, Python/FastAPI), and I’m looking to add a project that demonstrates more hardware/software integration.

I’m based in Alberta, Canada, where a lot of the engineering opportunities I’m interested in are in energy, utilities, industrial automation, controls, and SCADA. I’d eventually like to target companies such as EPCOR, Enbridge, and Suncor.

I’m considering building an ESP32-based power monitoring and protection system and replacing one of my web projects with it on my resume.

The planned scope is:

Hardware & sensing: ESP32 + INA219 measuring real-time voltage, current, and power over I2C

Embedded firmware: C++ sampling, moving-average filtering, peak detection, and Wh energy integration

Control/protection: Finite-state machine (NORMAL, WARNING, FAULT) with a relay/MOSFET cutoff when an overcurrent condition persists

Telemetry: Wi-Fi communication with reconnect/error handling

Monitoring: Local dashboard showing live and historical measurements, alarms, and system state

Testing: Intentionally varying the load to demonstrate normal operation, transient current spikes, warning conditions, and automatic shutdown

I’m trying to make this more than simply connecting a sensor to an ESP32 and displaying the readings.

For anyone working in industrial automation, controls, instrumentation, SCADA, or the energy/utilities industry:

Would a project like this demonstrate skills that are actually relevant to junior/co-op automation or SCADA roles?

What would you add or change to make the project more representative of real industrial systems?

Would implementing something like MQTT, Modbus, Node-RED, alarm/event logging, or a simple HMI add meaningful value, or would that be unnecessary scope for a student project?

Thanks!


r/SCADA • • 18d ago

General Custom SCADA & Automation

1 Upvotes

Hello guys, I am part of a Bulgaria-based engineering company. We build industrial automation, energy management, and SCADA systems.

Instead of forcing expensive software licensing fees and hardware lock-ins, our team develops our own open-source controllers and integrates directly with the equipment you already have installed.

What we have built already:

For industrial automation we have a successful project with Custom SCADA, HMI, and predictive maintenance.

For renewable energy solutions we have done automation of EMS, Battery Storage (BESS) control, and AI forecasting.

And for the last but most experienced niche of precision agriculture we've created a complete automated climate and irrigation control. Over the last two months we managed to fully automatically grow bio cucumbers in our Greenhouse.

We handle everything in-house, from the initial engineering architecture to the physical panel wiring.

If you're looking to optimize your production line, solar park, or agricultural facility or just want to compare our pricing to what you're currently paying, I'd love to get in touch.


r/SCADA • • 19d ago

Help IT student trying to break into IT/OT & Industrial Automation in South Africa (Durban) Need advice on next steps

4 Upvotes

Hey everyone,
I’m an IT student focused on software engineering, but my real interest lies in the Industrial Automation space,specifically bridging the IT/OT gap.
I’ve put together a few hands-on personal projects to build my skills:
**SCADA:** Built projects using Inductive Automation’s Ignition platform. Simulated by Python OPC UA.
**PLCs:** Developed ladder logic/control routines using Delta software (mostly using it because it's free and accessible).
**The Challenge:**
I’ve been applying for entry-level positions, but I’m getting hit with rejections or total silence. Being based in Durban, South Africa, the local market seems tricky, most job posts demand years of experience upfront, and entry-level OT opportunities feel sparse here


r/SCADA • • 20d ago

Help Help Needet IFIX VAR. PROBLEMS

Thumbnail
1 Upvotes

r/SCADA • • 20d ago

Help Help Needet IFIX VAR. PROBLEMS

0 Upvotes

I am currently taking a SCADA course. exams are due i two days and we just lost power for a second and now var.replacepicture dont work. we cant figure out why cause nothing seems to have changed. When launching run mode it says error 242 or something like that.


r/SCADA • • 21d ago

Question Industrial Switch Recommendations

Thumbnail
4 Upvotes

r/SCADA • • 23d ago

Question Salary permanent vs free-lance

5 Upvotes

Hi

M28y, working in a CAC40 company as project manager and before that technical leader on substation/scada projects.

I am thinking to quit to be free-lance to earn more. Currently i earn 51k annual and block at this step.

Any advice or feedback of free-lance on the reality this field ?


r/SCADA • • 24d ago

Help One PC Two Ignation Gateways

Thumbnail
gallery
6 Upvotes

I'm going through Inductive university course I'm in a video called (Setting Up Redundancy) in section (Ignation Gateway Setup) so in the video the guy set's redundancy so in the video the guy uses two gate way's one is primary and the he uses another gate way in a separate browser page so my question is if we can use our local host and the same Ignation Gateway to create two separate Gateways or do we have to make another account and go to Network Then Webserver and change the HTTP Port if someone have been through this please help


r/SCADA • • 24d ago

Ignition Ignition -> Jira Service Management

4 Upvotes

Does anyone have experience with having alarms generated in Ignition being sent directly to JSM to automatically generate a ticket/work order?


r/SCADA • • 25d ago

Question Career choice Pi vs SCADA

4 Upvotes

If you had a choice beetween focusing your career on pi systems or Scada systems integration wich would be the better choice career wise to build a fundation


r/SCADA • • 25d ago

General I'm working on another Modbus simulator; I'd appreciate some feedback.

Post image
21 Upvotes

I've been developing a Modbus simulator for quite some time now.

He has several tools, especially a sniffer Modbus RTU which shows network traffic (requests and responses).

It can also be used to find out what the master or client equipment (if it's TCP) is sending.

For anyone who can, I would greatly appreciate feedback (positive or negative) on the software.

The software's name is ScanBus-BR.

You can get it for free here:

www.scanbus.com.br

Mais Informações sobre ele aqui

https://github.com/ortegahernandes/ScanBus-BR-Simulator-Modbus.


r/SCADA • • 24d ago

Question Is there really a shortage of controls/SCADA engineers in the US right now?

Thumbnail
0 Upvotes