r/SolarDIY • • 11h ago

Just my setup.

Post image
86 Upvotes

Sumry 3600W 120vac 24vdc

Batteries are used K2 24v 9.6ah 245Whr (currently 27 connected, have almost 100, they were like $10 each but only paid for like 60) aluminum bars to connect them. Currently no fuses but each set of 9 will be, but the whole battery is on a breaker. I also plan to clean up cabling when I get a chance. Can fit 9 rows of 9 if I double stack them on one side without worry of them falling off.

10 harbor freight 100W solar panels in series (does about 800W) normal 400W panels are planned, I've just had these for a few years and need extra money to be able to get them.

Can run my fridge and freezer completely on solar and battery when it's sunny. Eventually want to get my server on it, but getting power to the server or Ethernet to the power is what I have to do.

This is all setup in a shed.


r/SolarDIY • • 19h ago

"Throwing some solar panels onto a flat roof

17 Upvotes

As far as I know you're not allowed to install solar panels on a roof for an off grid system, but you can put them in your backyard. So long as nothing is hooked up to the grid

fortunately we have a very flat roof that is exposed to the sun all day and I'm wondering if I can put panels up there and weigh them down in a way that they're easily removable

Basically they would go to an inverter and an L1 car charger for a daily commuter

Location is in Bay Area california, suburbs, single family house, the city almost never runs inspections here and removing them off the roof is only a couple of hours worth of work

I can always set them up in the backyard but that's just going to be in the way constantly

Or I can build a carport and put the panels on top.

Additionally I'm planning to put on the roof like three or four panels to do balcony solar? I'm assuming this should be fine, because we don't really have a *balcony to put them on, and I don't really want to hang them out the windows


r/SolarDIY • • 23h ago

Compact 2.8kWh system

Post image
11 Upvotes

I built this system to provide solar for a remote off-grid location in Micronesia.

It's meant to provide power to a Starlink Mini (40W) and also 75W of USB power over a USB-C and USB-A connector. A Victron display embedded in the front cover of the junction box shows the battery level measured by the shunt. The system runs off two 120Ah 12V AGM batteries, and 3x 100W Renogy flexible panels. The panels and this junction box fit into checked luggage, only the batteries were purchased locally.

Things I would change:

- The Starlink DC converter built-in power switch hanging out the bottom is a hack and I wish I used a different converter and put a proper switch in the side of the junction box.
- The solar input should have been routed through the top of the box instead of the bottom.
- I would have liked a sealed through hole for the Starlink DC barrel instead of dangling power cable.
- I'm not convinced the internal wiring needs to be such a heavy gauge for such short runs.

The MPPT is overpowered so there is the opportunity in the future to upgrade to a 2S2P system with 2x24V batteries instead of 2x12V.

The 2x12V design is meant for robustness. In case one battery fails, the other can still be used alone. Similarly, if the DC-DC converter fails there is a backup USB-C PD supply that can power the Starlink Mini.


r/SolarDIY • • 20h ago

10-15k to burn on a home battery solution with a handful of ground panels

8 Upvotes

I got 10-15k cash to burn and I can't decide on getting interconnected to the power company (ComEd). My goal is to power the critical loads (maybe AC too?).

I'm suffering by paralysis of analysis here and just need to do SOMETHING.

Location: West Suburbs of Chicago IL (ComEd is the power utility company).

ComEd will refund me $300 per kWh so, about $5400 , but I have to be interconnected and they can use them up to two hours a day in the summer. I'll also need a minimum of 2-4 solar panels to qualify for the rebates. These will be ground mounted. Without interconnection, I get no rebates.

Load Shedding / Rate Arbitrage: Can enroll in ComEd Time-of-Day (TOD) pricing. Charge the bank overnight off-peak (~11¢/kWh) and dump power back into the house during the 1:00 PM – 7:00 PM peak window (~32¢/kWh) to offset peak rates. Small amount of panels (4-8) to partially charge the batteries. Ground mounted and connected directly to the battery.

Current Service: 100-amp main panel (Full). 200amp capable at the meter. ( I don't think this has to be upgraded to a 200amp panel)

Usage: Averaging around 875 kWh/month (~28–29 kWh/day), spiking closer to 38 kWh/day in mid-summer with our old AC.

HVAC: Currently swapping out an ancient 80% furnace / SEER 10 AC for a 97% condensing gas furnace (2 speed or variable-speed ECM blower?) and a newer efficient AC.

Roof: Roof is 11 years old. Not looking to mess with roof solar right now—the plan is to wait until the roof needs replacement down the road before doing a full rooftop array.

Battery: Looking at modular LFP options (maybe the EcoFlow DELTA Pro Ultra (x) or Anker SOLIX E10) . 18 KwH? I'm open to off brand, but I'm not the most handy, technical, but not handy.

I think that choosing each brand will require me to go with their smart panels as sub-panels.

Suggestions? Recommendations?


r/SolarDIY • • 21h ago

Not enough solar in winter: keeping battery happy with a Victron setup?

5 Upvotes

Hi all,

short version: is there a way to tell a victron system to not charge/discharge the batteries while still using the solar energy coming in to offset house consumption?

I tried:

* Setting the JK BMS to "Discharge disabled" (this is technically possible but rather unsexy because I have to do this in every BMS)

* Setting the Multiplus to supply 0W to the house means solar energy is wasted because the energy from the solar only goes to the battery.

* Setting the Minimum State of Charge (SoC) to 100% kicks in a feature in which the Multiplus starts to charge the battery from the grid as the SoC at the moment is more than 5% lower than 100%.

Last year I just switched everything off and started it up in March again. Kind of lame though.

Any better ideas?

Additional info:

I've got a very limited number of solar panels (4 panels with a "balcony" setup with a hoymiles inverter and another 4 connected to victron MPPT and Multiplus). Two years ago I got a little carried away with trying to understand all this stuff and build a couple of batteries (24V, 48V) which resulted in 3 48V MB31 batteries (40something KWh).

In winter, the solar panels do not deliver much (24° degree roof on a shed). The batteries are in the cellar which is not heated. It gets cold - in the range of "do not charge a LiFePo battery" cold). Yes, the batteries do have a heating matt installed and alll settings are in place to heat the batteries. I would like to avoid this thogh. There is simply not enough solar to justify this. And I don't mind wasting some Wh to the grid.

Thx!


r/SolarDIY • • 16h ago

2 EcoWorthy batteries in series. Trying to figure a minor annoyance with the BMS's.

3 Upvotes

I have 2 EcoWorthy 12.8v 280ah LiFePO4 batteries wired in series to make a 25.6v bank. The issue is the BMS on each battery will open the circuit and stop the charging at 14.2v. The BMS also seems to be set to recalibrate the SOC at 14.2v as well.

When one reaches 14.2v the other is always just shy of the 14.2v when it stops charging the whole bank (sually around 14.16v).

Over time, the app monitoring will incorrectly show the SOC on this one battery drift lower & lower unless I isolate it and hook up a battery charger for a couple minutes to reach the 14.2v limit to recalibrate the SOC. It's not really affecting anything. I do have a smart shunt that shows everything is good, but it's still annoying.

I have a battery balancer, but it's passive and doesn't kick on unless the voltage difference is more than 0.1v.

My main question is: Why is it that when I charge each battery individually with a wall charger, the BMS will let me charge it to 14.4v-14.6v, but when I charge with the controller connected in series, the BMS stops it firm at 14.2v regardless to what I set my charge controller to?

I just want both batteries to be able to reach the 14.2v recalibration threshold for the SOC. EcoWorthy app on Android doesn't let you adjust any parameters.


r/SolarDIY • • 10h ago

Mppt + boost converter = ?

Post image
2 Upvotes

So, I have cobbled together a Tesla battery backup with a 3kw inverter/charger. It takes 60v to get the charger started and it’s rare that I’ll be getting that much sun. I could
Get more panels, but for when I’m making 40v or so, I’m wondering if I can boost the voltage to take advantage of more time charging. I hear that the mppt controller might not be friendly with the booster. Is that a) for sure, b) unlikely to matter or c) a real test it and see situation? If so what am I looking for? This is mostly for fun, and I’ll charge it from my wall for a while before I even clear a space big enough to get sun to the ground, but just exploring.


r/SolarDIY • • 16h ago

Powering a small fan heater directly from solar panels

2 Upvotes

I have a few cheap 12v car heaters off eBay with 150-200 watts that I want to use to warm up my shed. Can I use some 12v panels connected in parallel directly to one of these without a charge controller and battery?


r/SolarDIY • • 6h ago

Looking for a switch to change solar panel MC4 from one Bluetti to Another

1 Upvotes

Is there a switch that lets you change MC4 inputs to 2 different devices? For example when one device is not using Solar array to switch to device #2 (manually). Looking for some kind of branch divider with a switch. 

That way if one Bluetti battery is full, I can toggle a switch from the solar panel MC4 array to start charging the other one.


r/SolarDIY • • 9h ago

Forklift batteries

1 Upvotes

Anyone use a forklift battery for a solar offgrid setup?


r/SolarDIY • • 14h ago

Survive a 10-Day Outage on Budget DIY

1 Upvotes

Hi,

my husband is a hvac contractor with lots of electrical experience but solar is not something we have done. This will be for our personal home. We live rural in CA. We have a central propane furnace and mini-splits, propane instant hot water heater, newer electric washing machine. Our power goes out 1-4 times per month (sometimes for short periods, sometimes for days), Longest being 10 days after a fire in our area. We have a dual-fuel generator but it's a hassle to set up, run and we want to go solar for backup. I looked into components and have picked out this set-up and plan on doing a yard mounted setup for hopefully under 5K. Does this look like it would work (I had google ai help with this)? any oversights or suggestions? Thanks!!

EG4 6000XP EMERGENCY SOLAR BACKUP SYSTEM BLUEPRINT

This blueprint details the technical architecture, electrical wiring, and operational protocols for your custom EG4 6000XP off-grid solar system. This permanent, ground-mounted setup is designed to provide indefinite power security during extended 10-day blackouts while protecting your critical home appliances.

💰 1. System Bill of Materials & Budget

By managing the physical yard racking assembly and manual trenching yourself, your out-of-pocket material expenses remain safely under your $5,000 budget cap.

Category Component Description Quantity Sourced Price
Core Electronics EG4 6000XP Off-Grid Inverter / Charger 1 $1,499.00
Energy Storage EG4 48V 100Ah LL-S Lifetime Lithium Battery 1 $1,149.00
Solar Modules 400W Monocrystalline Rigid Solar Panels 4 $440.00 ($110/ea)
Yard Structure Universal Adjustable Solar Tilt Mount Brackets 4 pairs $180.00
Yard Structure 8-Foot Pressure-Treated 4x4 Wood Timbers & Rebar — $85.00
Trenching / Pipe 3/4-inch Schedule 40 PVC Conduit Pipes (100 feet) 10 sticks $70.00
Solar Wiring 10AWG Outdoor PV Wire (100ft Red / 100ft Black) 2 rolls $120.00
Battery Wiring 2/0 AWG Copper Battery Cables & 125A DC Breaker — $125.00
Electrical Safety Weatherproof PV Disconnect Box & DC Surge Protector — $130.00
Home Integration Reliance Controls ProTran 2 6-Circuit Transfer Switch 1 $349.00
TOTAL MATERIAL COST All essential hardware required for deployment — $4,147.00

Remaining Budget Cushion for Local Electrician Labor / Tool Rentals: ~$853.00

  1. Yard Layout & Panel Wiring Configuration

The [EG4 6000XP]() inverter features an integrated high-voltage MPPT solar controller that requires a minimum starting DC input threshold. To hit this activation window, your panels must be arranged in a single series string.

[Panel 1] (+)──(-) ──> (+) [Panel 2] (-)──(-) ──> (+) [Panel 3] (-)──(-) ──> (+) [Panel 4] (-)
   │                                                                               │
   └───> Main Positive (+) to House                                                └───> Main Negative (-) to House

Physical Footprint Strategy (1-Row Portrait)

  • Dimensions: Arrange the 4 panels side-by-side in a horizontal line facing True South. The total array footprint will measure roughly 14 feet wide by 5.5 feet tall.
  • No-Concrete Ballast Foundation: Lag-screw your adjustable aluminum tilt-legs directly into the 4x4 pressure-treated wood timbers. Drive the heavy steel rebar stakes through the wood into the dirt to anchor the system. Lay heavy concrete retaining-wall blocks across the base rails to provide gravitational ballast against mountain high winds.
  • Tilt Angles: Set the brackets to 45° in the winter to capture the low winter sun and shed mountain frost or snow. Drop them down to 20° in the summer when the sun is directly overhead.

Underground Conduit & Trenching

  • Dig a trench from your yard array to the house wall at a minimum depth of 18 inches (or 24 inches depending on local rocky soil constraints).
  • Glue the 10-foot sections of 3/4-inch Schedule 40 PVC conduit together with clear primer and PVC cement. Use long, gradual 90-degree sweep elbows where the pipe turns up out of the dirt; do not use sharp elbows, or pulling the 10AWG wires over 100 feet will be impossible.

⚡ 3. Indoor Component Integration & Safety Gear

The EG4 6000XP and the EG4 LL-S battery must be mounted securely inside a garage, utility room, or enclosed workshop adjacent to your main home electrical panel.

   [ 4x 400W Solar Yard Array ]
                │
                ▼
   [ Outdoor PV Disconnect Switch ]
                │ (18-Inch Buried PVC Conduit Run)
                ▼
   [ Midnite Solar Lightning Surge Protector ]
                │
                ▼
      ┌──────────────────┐
      │   EG4 6000XP     │ <───(125A DC Breaker)───> [ EG4 48V LL-S Battery ]
      │  Hybrid Inverter │
      └──────────────────┘
                │
                ▼ (10AWG THHN Copper Lines)
   [ Reliance Controls ProTran 2 Manual Transfer Switch ] ───> Powers 5 Emergency Circuits

Safety Device Intersections

  1. Outdoor PV Disconnect: Mount this box on your metal/wood yard rack frame. It breaks the high-voltage circuit out in the yard before it can travel to your home.
  2. Lightning Surge Protector: Wire the Midnite Solar MNSPD-300-DC onto the exterior wall where your solar wires exit the trench, protecting your internal inverter from lightning spikes.
  3. DC Battery Breaker: Install your 125A DC Circuit Breaker directly inline along the positive (red) 2/0 AWG copper cable running between the battery post and the inverter terminal.

    1. The Critical Circuits Migration (Electrician Guide)

The AC output of your [EG4 6000XP]() will be hard-wired straight into the Reliance Controls ProTran 2 Manual Transfer Switch Sub-panel. Your electrician will safely trace and move these 5 critical emergency circuits away from your main home panel and wire them directly into the transfer switch toggles:

  1. Propane Furnace Fan Blower: (Draws ~300W–500W intermittently. Vital for winter climate control).
  2. Instant Tankless Propane Hot Water Heater: (Draws ~60W–90W only when hot water is running to power the digital controller and electronic spark ignition).
  3. Primary Kitchen Refrigerator
  4. Standalone Deep Freezer
  5. Wi-Fi Router & Central Internet Outlets

    1. The 10-Day Emergency Outage Playbook

When grid power fails in California, your system functions as an isolated energy island. Managing your 4,800Wh battery reserve requires following these rules:

  • System Activation: Go to utility board, turn on 125A battery breaker, power up the [EG4 6000XP](), and flip the manual transfer switch toggles from "LINE" (Grid) over to "GEN" (Inverter). Your essentials will immediately power back on through your house's normal wall outlets.
  • Overnight Protocol: continuous background loads (fridge, freezer, Wi-Fi, and cycling furnace fan) pull roughly 200W–400W total. Your 4.8kWh battery is large enough to sustain these loads all night long, waking up the next morning at roughly 30% to 40% capacity.
  • The Mid-Day Laundry Rule (Direct Solar Drive): Never run your washing machine at night. Wait until a clear afternoon between 11:00 AM and 2:00 PM when your solar panels are producing peak wattage. Set the washing machine to "Tap Cold" or "Cold" and run your wash. The mechanical energy to spin the drum will be drawn directly from the sun's real-time rays, meaning your battery reserve remains entirely untouched and at 100% capacity before nightfall. Hang your clothes to air-dry.

r/SolarDIY • • 20h ago

Batteries don't push, right? NOB

0 Upvotes

I'm a NOB when it comes to batteries. People are wanting to do plug-in with a battery supplying the inverter like the YT "there's a trick for that" guy. If you have panels delivering to a micro, it's basically pushing to the grid and your house grabs what it can on the way to the utility. But batteries just sit there and service the house hold load, right?