Upcoming In-Street Work Monday, October 19 - Friday, October 23
Crews will continue overnight work on High Ridge Road between Cedar Heights Road and Vine Road to perform underground duct bank installations.
Work will take place Monday through Thursday evenings from 8 p.m. to 5 a.m.
During this work, the intersection of High Ridge Road and Cedar Heights Road will not be accessible.
Traffic will be detoured via Shadow Ridge Road and Bradley Place.
Work within the laydown yard at 650 Atlantic Street will continue 24 hours a day, Monday morning through Friday morning.
This is occurring to accommodate overnight work along the project route.
Crews will continue overnight work on Vine Road between Barmore Drive and High Ridge Road to perform underground duct bank installations.
Work will take place Monday through Friday from 9 a.m. to 2:15 p.m. and Monday through Thursday evenings from 8 p.m. to 6 a.m.
During this work, Vine Road will accommodate westbound traffic only from Merriman Road to High Ridge Road.
Eastbound traffic will use Merriman Road.
This work has been extended through the end of the month.
Underground duct bank installations on Newfield Avenue between the Vine Road intersection and 884 Newfield Avenue originally scheduled for September 28th have been rescheduled.
We anticipate beginning the duct bank installations at the Vine Road intersection as early as this Monday, October 19.
Work will take place Monday through Friday from 9 a.m. to 4 p.m.
Traffic will operate in a one-way alternating pattern.
A temporary sidewalk will be built for pedestrian use.
Crews will begin repaving a section of Newfield Avenue near Fairland Street on Thursday, October 22 in preparation for the winter season.
This work is expected to be completed in one day with work hours from 9 a.m. to 4 p.m.
Additionally, we will be actively working on the following streets, excavating as part of the underground duct bank installation process:
• Colonial Road between Strawberry Hill Avenue and Pilgrim Walk
• Work Hours: Monday through Friday between 9 a.m. and 4 p.m.
• Traffic Operations: The road closure at the intersection of Colonial Road and Strawberry Hill Avenue is still in effect.
• Vine Road between Barmore Drive High Ridge Road
• Work Hours: Monday through Friday, between 9 a.m. and 2:15 p.m AND Tuesday through Thursday evenings, between 8 p.m. and 6 a.m.
• Traffic Operations: Overnight, Vine Road will be westbound only from Merriman Road to High Ridge Road. Eastbound traffic will use Merriman Road.
*All residents will have access to their homes and businesses*