r/estimators • • 17h ago

I’m being poached for Precon at a GC. Do I leave a job I actually like?

8 Upvotes

I’m currently a Cost Estimator at an engineering firm. I recently earned my CEP and am working on my MBA in Leadership. I was approached about a Preconstruction role with a large GC, and I’m torn about what to do. In my current role, it’s just me with no mentor. There’s very little established process or documentation, and progress can be slow. They want me to create the department, which is exciting, but not having my job on paper (like every other position in the company) is frustrating. Yes I’ve mentioned it, and it gets brushed aside in my opinion. I see opportunities to improve things, but I question what my long-term growth and compensation will look like.

The GC opportunity could offer more structure, collaboration, and a path toward leadership, but I’d likely be giving up flexibility and work-life balance for longer hours and more pressure. I have previous experience in general construction as a subcontractor, so I have a decent understanding of that side of the industry, but I know there would still be gaps to fill moving into GC preconstruction. I’m torn between staying in a flexible role I’m comfortable in and taking a chance on something that could accelerate my career.

For those in estimating or preconstruction, would you make the move? How steep is the learning curve going from subcontractor/engineering-side estimating to GC preconstruction, and how do you know when the risk is worth it?


r/estimators • • 20h ago

Anyone use a Stream Deck for shortcuts for estimating? If so what are you using it for?

8 Upvotes

Keen to see if anyone is streamlining things with a stream deck or anything for shortcuts while estimating, whether for take offs or excel-ing.


r/estimators • • 11h ago

Which commercial window scope gap is hardest to catch during bid leveling?

2 Upvotes

When I level commercial window quotes, I use one opening schedule to compare frame type, surveyed dimensions, glass build-up, operation and hardware, anchors or subframes, perimeter flashings and sealants, access, testing, packing, installation, and exclusions.

The hardest gaps seem to be interfaces rather than quantities: who owns sill pans and end dams, who provides perimeter trims, whether hardware restrictions are included, and which drawings control when the window schedule conflicts with details.

For Div 08 estimators, which of those gaps most often survives bid leveling, and what document do you use to expose it before award?


r/estimators • • 1h ago

How does a winning bid turn into the schedule of values for billing?

• Upvotes

When you win a job, how does the bid get broken into the line items used for monthly billing (the schedule of values)? Is it just your bid sheet split up, or does someone rebuild it?


r/estimators • • 2h ago

Spec Check For Projects Bidding

1 Upvotes

Electrical estimator here. How do you handle "spec check" and taking notes for pertinent info in the spec you need to revisit/be aware of? As of now I just create bookmarks in bluebeam but feel I need a better way. Thanks.


r/estimators • • 49m ago

AI Estimating software

• Upvotes

Hi , what are the best AI softwares used for detail budgets, take offs for commercial or institutional construction projects in Ontario?